Build path · High-performance
All-electric, net-zero & Passive House.
In the City and Town of Ithaca, new homes are already all-electric by local law. The question is how far past the code to go: a heat-pump home, a high-performance envelope, or a certified Passive House.

The Ithaca Energy Code Supplement (2026 phase)
The IECS applies in both the City of Ithaca and the Town of Ithaca to new construction, additions of 500 sq ft or more on one- and two-family homes, and major renovations. In its 2026 phase it requires fossil-fuel-free heating and hot water and a net-zero-ready approach. Practically: heat pumps for heating and cooling, a heat pump water heater, an electric or induction range, and an envelope tight enough to keep the electric load reasonable.
The NY All-Electric Buildings Act
New York’s law requires all-electric equipment in new low-rise buildings (seven stories or fewer, including single-family homes) starting in 2026. The U.S. Court of Appeals for the Second Circuit upheld it in mid-2026, while enforcement has been subject to stipulations during the federal appeal. For a home designed now in any Tompkins County town, planning all-electric is the safe assumption.
Lansing, Ulysses, Dryden and the other towns follow the state energy code rather than the IECS. All-electric is still the direction of state law and of the incentive programs.
Three levels of performance
| Level | What it means | Cost effect |
|---|---|---|
| Code-minimum all-electric | Cold-climate heat pumps, heat pump water heater, code insulation and air-sealing | Baseline |
| High-performance envelope | Continuous exterior insulation, triple-pane windows, ERV, solar-ready roof and wiring | +6–10% |
| Phius Passive House certified | Modeled and tested to Phius targets; very low air leakage; heating load a fraction of code | +10–25% (hard cost $350–$550+/sq ft) |
Premiums relative to a code-built home of the same size.
Local precedents
Tompkins County has some of the densest concentrations of high-performance housing in the state, including Passive House neighborhoods at EcoVillage at Ithaca (TREE) and Village Grove in Trumansburg. Builders and architects here have done the airtightness detailing, window installs and ventilation many times.

Heat pumps for 5°F winters
Cold-climate air source heat pumps (ccASHP) keep working well below zero, but they must be sized from a room-by-room load calculation at the local design temperature of about 5°F. Oversizing wastes money; undersizing means resistance backup heat on the coldest nights. A tighter envelope shrinks the equipment, which offsets part of the envelope premium.
Stacking incentives
- NYSERDA New Efficient Homes New York (PON 6242): up to $5,000 per unit in Enhanced Design Support, declining-block heat pump incentives for new construction, and a $1,000 per unit bonus in designated Disadvantaged Communities.
- NYSEG NYS Clean Heat: about $800 per 10,000 Btu/h of heating capacity at 5°F for qualifying cold-climate heat pumps, capped at 120% of the calculated load.
- Federal and state solar incentives where available for a solar-ready roof.
Details and sequencing are on the incentives & financing page.

Start with what you have
Bring your land details or early sketches.
A parcel address, a rough size and a budget are enough to begin. We check zoning, septic and code, model the real costs, and introduce two or three vetted Tompkins County builders who fit the project.