Tompkins HomesFinger Lakes pre-construction Start a Project

Tompkins County guide

Building permits & zoning, town by town.

Every municipality in Tompkins County runs its own building department and fee schedule. This directory shows how each one calculates a new-home permit, whether the Ithaca energy code applies, and what to settle before you apply.

New single-family home permits across Tompkins County
MunicipalityPermit fee methodIECS 2026Water & wastewaterExample: 2,200 sq ft at $300/sq ft
City of IthacaSliding valuation scale (≈1% of estimated valuation, plus plan review & fixture fees)YesPublic water & sewer on nearly all lots$5,990
Town of IthacaTiered improvement-valuation schedule (≈$150 base + value tiers); double fee for unpermitted workYesBolton Point public water across much of the town; sewer varies by area$4,110
Town of Lansing$0.50/sq ft new 1–2 family, modular, additions, finished space; $0.20/sq ft attached garage; $0.30/sq ft detached accessory ($100 min)State codeBolton Point water in parts of the town and Village of Lansing; wells & septic elsewhere$1,100
Town of Ulysses / Trumansburg$0.80/sq ft new 1–2 family & finished basement, or $8 per $1,000 valuation, whichever is greater; $0.55/sq ft unfinished basement; +10% zoning compliance reviewState codeVillage of Trumansburg water/sewer in the village; wells & septic in the town$5,808
Town of Dryden$25 base + per-sq-ft multiplier under the current town schedule; stormwater / ground-disturbance review where applicableState codeVillage water/sewer in Dryden & Freeville; Varna/Etna partial; wells & septic elsewhere$1,015
Town of CarolineTown building permit schedule (estimated here); zoning compliance under Local Law No. 2 of 2024State codePrivate wells & septic$1,040
Town of DanbyTown building permit schedule (estimated here)State codePrivate wells & septic$1,040
Town of EnfieldTown building permit schedule (estimated here)State codePrivate wells & septic$1,040
Town of GrotonTown building permit schedule (estimated here)State codeVillage of Groton water/sewer in the village; wells & septic in the town$1,040
Town of NewfieldTown building permit schedule (estimated here)State codePrivate wells & septic (hamlet water in parts)$1,040

Sources: municipal fee schedules (2025–2026). City/Town of Ithaca and the towns marked “estimated here” are modeled approximations; confirm the exact fee with the building department. The example excludes plan review, plumbing fixture and TCHD septic fees.

City of Ithaca

The City charges on a sliding valuation scale: a small base fee for minor work, then roughly 1% of estimated project valuation in the lower brackets, scaling with value, plus plan review and plumbing fixture fees. The City enforces the 2026 IECS and the May 2025 by-right ADU ordinance in R-1, R-2 and R-3. Nearly every lot is on public water and sewer.

Town of Ithaca

A tiered schedule based on improvement value, with a base residential application fee around $150; work started without a permit pays double. The Town has its own zoning code (separate from the City), enforces the IECS, requires Bolton Point water sign-off where served, and sends larger ground disturbance to engineering review for a SWPPP (stormwater pollution prevention plan).

Town of Lansing

$0.50 per sq ft for new one- and two-family homes, modular homes, additions and finished living space; $0.20 per sq ft for attached garages; $0.30 per sq ft for detached accessory buildings ($100 minimum). Fees double for work without a permit. The Village of Lansing has its own code office.

Town of Ulysses and Trumansburg

$0.80 per sq ft for new one- and two-family homes and finished basements, or $8 per $1,000 of estimated valuation, whichever is greater; $0.55 per sq ft for unfinished basements; plus a 10% zoning compliance review fee. On a $660,000 house, the valuation method governs. The Village of Trumansburg administers its own permits.

Town of Dryden

A $25 base fee plus a per-square-foot multiplier under the current schedule, with stormwater and ground-disturbance review where applicable. The Villages of Dryden and Freeville run their own water and sewer.

Town of Caroline

Caroline adopted the Town of Caroline Zoning Law (Local Law No. 2 of 2024), ending decades without town-wide zoning. It creates rural and agricultural districts, hamlet districts in Brooktondale, Slaterville Springs, Caroline Center and Speedsville, and a Stream Corridor Overlay District that limits building near streams. Check the district and overlay before buying land.

Danby, Enfield, Groton and Newfield

Each town has its own code enforcement officer and fee schedule; most new homes are on private wells and septic, so the Tompkins County Whole Health septic permit is part of every application. Groton and Newfield have their own school districts, which matters for property taxes.

Stormwater (SWPPP) triggers

Disturbing one acre or more triggers New York’s construction stormwater permit and a SWPPP; some towns review smaller disturbances on steep slopes or near streams. Long driveways and walk-out basements on hillside lots add up quickly.

What every application needs

A site plan with setbacks, construction drawings (stamped where required), an energy code compliance path, septic approval or sewer sign-off, and a driveway or highway access permit if you are cutting a new curb onto a town or county road.

Barns and autumn hills in upstate New York

Start with what you have

Bring your land details or early sketches.

A parcel address, a rough size and a budget are enough to begin. We check zoning, septic and code, model the real costs, and introduce two or three vetted Tompkins County builders who fit the project.