Tompkins HomesFinger Lakes pre-construction Start a Project

Build path · Accessory dwelling

Building an ADU in Ithaca & Tompkins County.

Since May 2025 the City of Ithaca allows accessory dwelling units by right in its main residential zones, and a state-funded program can pay up to $125,000 toward one. Here is how the rules, the costs and the grant fit together.

Small yellow cottage with a metal roof in a garden

The City of Ithaca ordinance (May 2025)

ADUs are allowed by right — building permit review only, no special permit or rezoning — in the City’s R-1 (Fall Creek, Belle Sherman), R-2 and R-3 (Collegetown, South Hill) zones.

City of Ithaca ADU standards (summary)
StandardRule of thumb
Size800–1,000 sq ft by zone and type, or 50% of the primary dwelling, whichever is less
Side setback~5 ft
Rear setback5–10 ft
Height20–25 ft maximum
Lot coverage~40% cap
ParkingRelaxed for ADUs
DesignsCity-sponsored pre-approved prototypes rolling out in 2026

Summary for planning; confirm the current text with City of Ithaca Planning and the Building Division.

New detached ADUs and additions of 500 sq ft or more also fall under the Ithaca Energy Code Supplement: all-electric heat and hot water.

Town of Ithaca and the outer towns

The Town of Ithaca writes its own zoning, separate from the City. Lansing, Ulysses, Dryden, Groton and the southern towns treat accessory apartments in their own ways; some require site plan review or a special permit, some limit ADUs to the primary structure. Caroline adopted its first zoning law in 2024 (Local Law No. 2), with rural/agricultural and hamlet districts and a Stream Corridor Overlay. See permits & zoning by town.

Detached cottage or conversion?

FormatCost per sq ftTypical turnkeyNotes
Detached backyard cottage$300–$450$150K–$320K+New foundation, utilities trenched from the house
Above-garage / carriage house$275–$400$160K–$300KStructure and stairs drive cost
Attached addition$275–$400$140K–$280KTie-in to existing roof and walls
Garage or basement conversion$175–$275$90K–$190KCeiling height, egress windows, moisture

Planning ranges for Tompkins County, 2026.

Small cottage in a garden
A 600–800 sq ft one-bedroom cottage is the most common detached ADU in the City.

Septic limits outside the sewer district

If the property is on a private septic system, adding an ADU usually adds bedrooms. Tompkins County Whole Health reviews system sizing, and the existing tank or absorption field may need to grow. Budget a soil evaluation before design. See septic, wells & site prep.

The INHS / NYS HCR Plus One ADU grant

The Plus One ADU program, administered locally through INHS with New York State Homes and Community Renewal funds, can provide up to $125,000 per project. The core conditions:

  • You own and live in the primary home.
  • Household income at or below 100% of Tompkins County Area Median Income.
  • The ADU is rented year-round to a long-term tenant — no short-term rentals.
  • Funding is available in rounds; apply before construction starts.

Use the ADU checker for a Pass / Review / Ineligible readout.

Barns and autumn hills in upstate New York

Start with what you have

An ADU starts with one address.

Send us the property and what you have in mind. We check the zoning path and septic question, then introduce ADU builders who work in your municipality.